Land To The North Of Sutton-Cum-Lound Nr. Daneshill Lakes

loading

Land To The North Of Sutton-Cum-Lound Nr. Daneshill Lakes, Daneshill Energy Forest, Daneshill Road, Lound

Application for extension to time limit for implementing existing planning permission from 28 August 2012 (as per Condition 1 of planning permission 47/09/00006) by an additional 3 years

Planning Applications

Click on the column headers to reorder table columns.

Licensee Planning ID Notes Submitted Decision Status Consultation
Dart Energy1/47/09/00006The mineral exploration will initiate the Coal Bed Methane production, exploration and development activities under DECC PEDL Licence (200) and will be conducted as the first stage of resource appraisal and as part of Composite Energy's obligations as an operator in the 13th Onshore Oil and Gas Licencing Round. This will comprise an appraisal borehole drilled vertically down to the coal seam to retrieve core samples. The mineral core will then be analysed for cleat structure, permeability and gas content. Equipment noted on the Site Layout Plan is for indicative purposes only. The bunds, gated access and the perimeter fencing will be in the location shown. The internal facilities of the site are indicative as the site layout will be determined by the site operating requirements and health and safety.21/04/200912/05/2009GrantedClosed
Dart Energy1/12/01296/FULApplication for extension to time limit for implementing existing planning permission from the 28 August 2012 (as per condition 1 of extant planning permission 47/09/00006) by an additional 3 years.22/08/201212/09/2012GrantedClosed

Environmental Permits

Click on the column headers to reorder table columns.

Licensee Permit ID Notes Comments open Comments deadline Status Consultation
Dart EnergyEPR/BB3000XB/A001Application from Dart Energy for an environmental permit for the management of extractive mining waste, resulting from the prospecting for oil and gas at Daneshill site06/12/201306/01/2014GrantedClosed