Crawberry Hill Day 27 (Fri 6th Jun)

Road Closure Sign Outside Rathlin Energy’s Crawberry Hill Site In Walkington, Yorks (Click To Enlarge)

Walkington Heads, the road the camp outside Rathlin Energy’s Crawberry Hill fracking site is on, is planned to be closed to through traffic for several weeks while the national grid works on nearby pylons.

This entry was posted in Crawberry Hill, Rolling blockade. Bookmark the permalink.