Yearly Archives: 2014
Upton Day 41 (Thurs 15th May)
A camp has been setup by the local community on the site where Dart want to construct a pad.
Crawberry Hill Day 5 (Thurs 15th May)
Rathlin’s contractors have hostipalised one person by running him over with a forklift truck. The police turned up and arrested two local residents just to add insult to in injury. People have been continuing to set up a camp at the Crawberry Hill fracking site to resist Rathlin EnergToday has seen more activity with contractors […]
Crawberry Hill Day 4 (Weds 14th May)
People have been continuing to set up a camp at the Crawberry Hill fracking site to resist Rathlin Energy’s plans to perform a mini-frac on the Bowland Shale. Today has seen more activity with contractors trying to get onto the site.
Crawberry Hill Day 3 (Tues 13th May)
People have been continuing to set up a camp at the Crawberry Hill fracking site to resist Rathlin Energy’s plans to perform a mini-frac on the Bowland Shale.
Upton Day 39 (Tues 13th May)
A camp has been setup by the local community on the site where Dart want to construct a pad. See below for more photos.
Crawberry Hill Day 2 (Mon 12th May)
People have been continuing to set up a camp at the Crawberry Hill fracking site to resist Rathlin Energy’s plans to perform a mini-frac on the Bowland Shale.
Upton Day 38 (Mon 12th May)
A camp has been setup by the local community on the site where Dart want to construct a pad. See below for more photos.
Daneshill Day 47 (Mon 12th May)
Most equipment has now been removed from the site and it has, at least temporarily been abandoned. The camp outside the site has also been packed down.